Paving

Gilsonite in Stone Mastic Asphalt (SMA)

· 1 min read · Sun Gilsonite Technical Team

Translate this article:
Gilsonite in Stone Mastic Asphalt (SMA) – Trailer of palletized gilsonite leaving the plant

Stone mastic asphalt (SMA) uses a coarse stone skeleton filled with a rich mastic of binder, filler and fibers. It offers excellent rut resistance and durability.

Role of the binder

SMA contains more binder than dense mixes. A stiffer binder reduces drain-down and improves rut resistance.

Benefits of gilsonite in SMA

  • Increases mastic stiffness
  • Helps reduce binder drain-down (with fibers)
  • Improves high-temperature stability
Gilsonite shipment strapped on a trailer – paving application

Formulation tips

  • 5–10% gilsonite by weight of binder
  • Keep cellulose or mineral fibers for drain-down control
  • Verify with Schellenberg drain-down test

Applications

Motorways, heavy-duty urban roads and airport runways.

SMA basics

Component Typical share
Coarse aggregate 70–80 %
Filler 8–12 %
Binder 6–7 %
Fibres 0.3–0.5 %

Why gilsonite helps in SMA

The rich mastic carries much of the load and must not flow in heat. A stiffer, gilsonite-modified binder improves mastic stability and reduces drain-down risk.

Construction tips

Use steel-wheel rollers, avoid over-rolling that can bring mastic to the surface, and control temperatures carefully.

See asphalt modifier gilsonite and mix design tips.

Recommended product

Data sheet

Asphalt Modifier Grade Gilsonite

Data sheet – Asphalt Modifier Grade Gilsonite
PropertyTypical valueTest method
AppearanceBlack powder or granulesVisual
Softening point (R&B)150 – 200 °CASTM D36
Ash content, max8 %ASTM D3174
Moisture, max1 %ASTM D95
Solubility in TCE, min95 %ASTM D2042
Specific gravity @ 25°C1.04 – 1.10ASTM D70
Particle sizePowder ≤ 200 mesh / granular 1–5 mmSieve
Typical dosage4 – 12 % by weight of binder
Packing25 kg bags, meltable bags or 1 MT jumbo bags.

Typical values. The final specification is confirmed in the COA of each shipment.

Need gilsonite for your next project?

Get a quotation, samples and full documentation (TDS, MSDS, COA) within 24 hours.

Request a Quote