Paving

Quality Control on Gilsonite Paving Projects

· 1 min read · Sun Gilsonite Technical Team

Translate this article:
Quality Control on Gilsonite Paving Projects – Rows of palletized gilsonite in the loading yard

A gilsonite-modified pavement is only as good as the quality control behind it.

At the plant

  • Verify gilsonite delivery and COA
  • Check dosage (weigh bags or calibrate feeders)
  • Monitor mixing time and temperature
  • Sample mix for lab testing

In the lab

  • Binder content and gradation
  • Marshall or volumetric properties
  • Extracted binder softening point (to confirm gilsonite content)
Truck loading of 25 kg gilsonite bags – paving application

On site

  • Mix temperature at delivery
  • Mat temperature and compaction
  • Core density and thickness

Records

Keep batch numbers of gilsonite used for each day’s production.

Verifying gilsonite content

Extract binder from mix samples and measure softening point or penetration. A significant drop compared with the design value may indicate missed additions or poor dispersion.

Plant checklist

Item Frequency
Gilsonite bag count or feeder log Every batch / continuously
Mix temperature Every truck
Mix sampling As specified

Field acceptance

Density, thickness and smoothness measurements according to the contract.

Sun Gilsonite provides batch-traceable asphalt modifier gilsonite with COA. See gilsonite quality control tests.

Recommended product

Data sheet

Asphalt Modifier Grade Gilsonite

Data sheet – Asphalt Modifier Grade Gilsonite
PropertyTypical valueTest method
AppearanceBlack powder or granulesVisual
Softening point (R&B)150 – 200 °CASTM D36
Ash content, max8 %ASTM D3174
Moisture, max1 %ASTM D95
Solubility in TCE, min95 %ASTM D2042
Specific gravity @ 25°C1.04 – 1.10ASTM D70
Particle sizePowder ≤ 200 mesh / granular 1–5 mmSieve
Typical dosage4 – 12 % by weight of binder
Packing25 kg bags, meltable bags or 1 MT jumbo bags.

Typical values. The final specification is confirmed in the COA of each shipment.

Need gilsonite for your next project?

Get a quotation, samples and full documentation (TDS, MSDS, COA) within 24 hours.

Request a Quote